Tar Desulfurization Treatment Packing

Product Details
Customization: Available
Material: Plastic
Process: Injection
Still deciding? Get samples of US$ 200/Piece
Request Sample
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2006

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
215
Year of Establishment
2003-01-17
  • Tar Desulfurization Treatment Packing
  • Tar Desulfurization Treatment Packing
  • Tar Desulfurization Treatment Packing
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Packaging & Shipping
  • Installation Instructions
  • Company Profile
  • Our Advantages
  • After Sales Service
  • FAQ
Overview

Basic Info.

Model NO.
FXP-DB210402-C1
Pore Shape
Honeycomb
Function
Support Body
Feature
Optimum Free Passage/Open Area
Sample
Free
OEM/ODM
Available
Color
White
Certification
ISO 14001:2015,45001:2018,9001:2018
Transport Package
Wooden Crate, Carton and So on
Specification
400-3000 mm
Trademark
FXSINO
Origin
China
HS Code
3926909090
Production Capacity
1000 Cbm/Month

Product Description

Product Description

Tar desulfurization treatment packing:
It is belongs to support components,which usually install in the bottom of packing layer. Owing to gas will pass through support components from the tower bottom, the size of the opening area will determine the flux and gas distribution. Over 75% opening area guarantees the free flow of gas and liquid and 3 mm plate thickness ensures that each product can withstand 300 kg (or more) of load
 

Inside Diameter 
mm
Outside diameter
mm
Minimum Width of Supporting
mm
Height
mm
Approx Weight
Kg/
400 385 20 50 6
800 770 40 50 17
1000 970 40 80 55
1500 1460 50 80 90
1800 1760 50 100 145
2100 2050 65 100 200
2400 2450 65 100 270
2700 2750 65 100 340
3000 2940 65 100 400
Detailed Photos
Tar Desulfurization Treatment Packing
Tar Desulfurization Treatment Packing

 

Packaging & Shipping

Tar Desulfurization Treatment Packing

Installation Instructions

1:According to the tower equipment diagram,and make sure that packing installation heights is correct.
2:When installing, it should always be poured from a certain height away from the packing layer. People should not stand directly on the packing to prevent the packing from deformation and uneven density. Wooden boards can be laid on the packing to disperse the force.
3:Other sundries, packaging bags, etc. is forbidden during the installation
4:Generally filled by random packing
5:After finished, if there is unevenness, use a wooden strip to naturally push it flat


 

Tar Desulfurization Treatment Packing
Tar Desulfurization Treatment Packing
Tar Desulfurization Treatment Packing


 

Company Profile

Tar Desulfurization Treatment Packing

Our Advantages

Tar Desulfurization Treatment Packing

After Sales Service

1:Pre-purchase service
Fully understand customer's requirement, and give our professional opinion to help them.

2:User Training
Owing to our product has many different type, so it has many different installation way. For each type product, we must let you know its basically installation way. If necessary, issue one installation manual to them.

3:Warranty services
So called"Warranty services" is repairing replacement of selected parts for a selected period of time. For the first year, the customers are provided with free replacement or repairing of the device for any problem except for Abnormal use environment. For EPC project, we will issue our warranty booklet to our customer for each components. As for unmentioned, we will negotiated with our customer about warranty range and period

4:Online support
24 hours online service. For different problems, we will find related staff to solve with your problem timely.

5:Return and Replacement
In the warranty period, we provide free replacement of the product in case of any queries. Of course, if customers does not agree, we will refund after reduce some fees related with this deal.

6:Outsourcing and guiding installation
For customer's different requirement, Under achieving related fees payed standard(such as worker daily install fees,board and lodging and so on),we can send our installation team to help customer to install product installation. Of course, if you do not need our installation, we also send our engineer to guide how to install. So you would pay for the guiding fees.

 

FAQ

 

Tar Desulfurization Treatment Packing



 






 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier