Cooling Condensing Tower Media

Product Details
Customization: Available
Cooling Method: Cross Flow
Ventilation Mode: Natural Ventilation
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2006

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
215
Year of Establishment
2003-01-17
  • Cooling Condensing Tower Media
  • Cooling Condensing Tower Media
  • Cooling Condensing Tower Media
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Product Parameters
  • Certifications
  • Packaging & Shipping
  • Installation Instructions
  • Company Profile
  • Our Advantages
Overview

Basic Info.

Model NO.
FXP-DB210308-C1
Material
PP
Air Contact Form
Wet and Dry
Air Contact Way
Open
Tower Shape
Any Shape
Noise Level
Low
Application Fields
Industrial
Certification
RoHS, UR, ISO, CE, CCC, Related Certification
Condition
New
Application
Cooling Tower, Agricultural and Highly Complex Ma
Structure
Big Void Ratio, High Heat Transfer Coefficient
Water Flow Feature
Three-Dimensional Flow, Uniform Water Distributio
Channel Structure
Diagonal Cross
Channel Inclination
20 Degree
Max. Solids Content in The Cooling Water
300 Ppm
Max. Operation Temperature
80 Degree
Transport Package
Wooden Crate, Carton, Pallet
Specification
910*600*450 mm, 480*600*445 mm
Trademark
FXSINO
Origin
China
HS Code
3926909090
Production Capacity
5000 Cbm/Month

Product Description

Product Description

Cooling Condensing Tower media:
Heat recovery from a flue gas stream by cooling and condensation in a packed bed column is widely used to increase plant's energy efficiency.  Cooling Condensing Tower media has the possibility to optimize the size of such cooling towers and therefore its derived investment costs through selection of best suitable mass/heat transfer components. 


Feature:
1:High flexibility according to installation situation
Variable dimensions and different strength classes
2:Optimised heat and mass transfer
Open cross structure generates high turbulence and consequently performance
3:High mechanical stability and high load bearing capacity.
Permanent connection points and wall strengths ensure accessibility
4:High durability
Use of age-resistant, effective materials
5:Complies with the highest fire protection regulations
Own formula using highly effective additives

Detailed Photos
Cooling Condensing Tower Media
Absorption towers, waste gas treatment (e.g. flue gas scrubbers), distillation columns, heat exchange, etc.
 

 

Product Parameters

Technical Parameters:

Size
mm
TSS  Short/Long Term
PPM
Effective Surface area m²/m³ Material Sheet Vertical Height
mm
910*600*450 500/300 125 PP 20
910*600*450 500/300 125 PP 20
910*600*450 500/300 125 pp 20
910*600*450 1000/500 100 pp 25
480*600*445 1000/500 100 pp 25


Wind resistance test:

                                   
Test Result
Wind Speed (m/s) 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2 1.3 1.4 1.5
Resistance (Pa) 6 6 7 7 8 8 8 8 8 9 9


 

Certifications
Cooling Condensing Tower Media
Cooling Condensing Tower Media
Cooling Condensing Tower Media
Packaging & Shipping

Packaging:
1: Round type Super sack(1000*1000*1000 mm) on Fumigation Pallet
20 super sacks is equal to one 20 GP container loading quantity
2: 100L Plastic Woven bag
10 bags is equal to one cubic meter
3: Cartons on Fumigation pallet
8 cartons is equal to one cubic meter
If you have any other requirement, do it on your requirement.
 
Shipping:
Once achieved Purchase with us, we will let you know our production Production plan and schedule.In case of delayed shipment, We will notify customers three days in advance.


 

Cooling Condensing Tower Media
Cooling Condensing Tower Media
Cooling Condensing Tower Media


 

Installation Instructions

Installation
1:According to the tower equipment diagram,and make sure that packing installation heights is correct.
2:When installing, it should always be poured from a certain height away from the packing layer. People should not stand directly on the packing to prevent the packing from deformation and uneven density. Wooden boards can be laid on the packing to disperse the force.
3:Other sundries, packaging bags, etc. is forbidden during the installation
4:Generally filled by random packing
5:After finished, if there is unevenness, use a wooden strip to naturally push it flat


 

Cooling Condensing Tower Media
Cooling Condensing Tower Media

 

Company Profile

FXSINO:
Founded in Pingxiang City of Jiangxi Province in 1998, mainly engaged in the design and manufacture of tower internals, packing, tower trays and the process of energy saving. Mainly develop the production, test and engineering service of mass transfer and separation in Chemical, Petrochemical, Refinery, Fertilizer, Oil & Gas and Environmental Protection areas.
With many years of technological development and production innovation, FXSINO has a very complete production equipment and strength. Widely cooperation with domestic famous Research institute & Multinational Group let FXSINO gain an unprecedented leap in the filed of production application recently.We provide our clients the best priced tower packing, trays and tower internals with good quality, practical utility and high - efficiency. Meanwhile, positively assist our customer resolve some questions which happened in project design, equipment commission, later maintenance& replacement etc.

 

Cooling Condensing Tower Media
Cooling Condensing Tower Media
Cooling Condensing Tower Media
Our Advantages

1:Automatic Intelligent warehouse
1.1 Allows auto handing and scaning of label info via OCR technology which integrated to Fxsino' warehouse system
1.2 Magnetic Guidance Lurking AGV Unmanned vehicle can pick, deliver,yard all cargo to warehouse
1.3:Connected with FXSINO EPR to fulfill warehouse process automation
1.4:Warehouse capacity is close to 80000 cbms

2:Intelligent management robot
2.1: 24 hours non-stop inspection against product's quality,package,worker's efficiency and so on .
2.2 Timely find equipment's failure and inform technical staff to repair
2.3.Face recognition technology will monitor workers working status and prevent irregularities by outsiders.
 
3:AR visual system+5G+MAS
3.1 Based on China Unicom mobile proxy server full coverage, Our customers can see the production status of orders in real time through AR glasses.
3.2 we can collect all data,include in product daily output, material consumption, warehouse real-time inventory, order progress and so on via 5G data platform.
 
4:Technical research and development capability
4.1 Through cooperation with co-partner named tianjin University,Zhejiang University of Technology,Nanchang University,Tsinghua University and so on,we can provide EPC to you. Meanwhile, to assist customers to resolve with facing problem.

 

After sales service:
1:Pre-purchase service
Fully understand customer's requirement, and give our professional opinion to help them.

2:User Training
Owing to our product has many different type, so it has many different installation way. For each type product, we must let you know its basically installation way. If necessary, issue one installation manual to them.

3:Warranty services
So called"Warranty services" is repairing replacement of selected parts for a selected period of time. For the first year, the customers are provided with free replacement or repairing of the device for any problem except for Abnormal use environment. For EPC project, we will issue our warranty booklet to our customer for each components. As for unmentioned, we will negotiated with our customer about warranty range and period

4:Online support
24 hours online service. For different problems, we will find related staff to solve with your problem timely.

5:Return and Replacement
In the warranty period, we provide free replacement of the product in case of any queries. Of course, if customers does not agree, we will refund after reduce some fees related with this deal.

6:Outsourcing and guiding installation
For customer's different requirement, Under achieving related fees payed standard(such as worker daily install fees,board and lodging and so on),we can send our installation team to help customer to install product installation. Of course, if you do not need our installation, we also send our engineer to guide how to install. So you would pay for the guiding fees.











 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier
People who viewed this also viewed