Customization: | Available |
---|---|
Material: | PP, PE, PVC, CPVC, PVDF |
Process: | Injection |
Still deciding? Get samples of US$ 0/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
VOCs Odour Control Scrubbers packing:
Equilateral octagonalshape design is the most distinguishing feature. This design enables an extraordinarily high scrubbing efficiency while minimizing the amount of media and packing depth required.Meanwhile, Evenly spaced rod design can largely eliminate clogging. Each layer's vertical downward rod's distribution is not only break large droplet, but also form many gas-liquid contacting areas. It will improve separation efficiency. Therefore, it is used in wet scrubber & gas stripping
The use of two stage scrubbing is often employed both to minimize chemical consumption as well as to control sulfur deposits when scrubbing H2S. The first stage operates at ± 80% efficiency and uses a caustic-only scrub at high pH (± 12.5). The air then passes to the second stage, where the remaining H2S is scrubbed with caustic / bleach solution at pH ± 9.5. The H2S present is destroyed at 99%+ efficiency. The blow-down from the 2nd stage, which will contain some amount of unused NaOCl, is sent to the sump of the 1st stage. In this way, additional H2S is destroyed and maximum consumption of expensive oxidising agent is assured.
Size |
Void Fraction |
Bulk Weight |
Bulk Number |
Packing Factor |
Drip Points |
mm | % | Kg/M3 | Pieces/M3 | /m | |
82.5*90 | 96.3% | 33.7 | 1165 | 23 | 388.000 |
Installation
1:According to the tower equipment diagram,and make sure that packing installation heights is correct.
2:When installing, it should always be poured from a certain height away from the packing layer. People should not stand directly on the packing to prevent the packing from deformation and uneven density. Wooden boards can be laid on the packing to disperse the force.
3:Other sundries, packaging bags, etc. is forbidden during the installation
4:Generally filled by random packing
5:After finished, if there is unevenness, use a wooden strip to naturally push it flat
After sales service
1:Pre-purchase service
Fully understand customer's requirement, and give our professional opinion to help them.
2:User Training
Owing to our product has many different type, so it has many different installation way. For each type product, we must let you know its basically installation way. If necessary, issue one installation manual to them.
FAQ:
About US
1: Are you a manufacture or trader?
We are a professional manufacturer over 20 years
2: Do you participate in Exhibition?
Yes, Such Achema, Chemical Technology Equipment Expo, ECEE and so on
3:Where is your company? And visit?
Located in Anyuan Industry Park, Pingxiang City, Jiangxi Province.Welcome you to visit
4:Payment way
For oversea market, 30% advanced payment and 70% against copy of B/L or negotiation with you
5: After sales service
Please watch our related description
6:How long does it take to receive a reply after sending an inquiry?
24 hours. For busy, 48 hours.
7:Working time
A.M 8:00-P.M.5:00. However, for any question from internet, telephone,wechat and so on, answer you immediately.
8:Third-party test?
We have our owned testing center. If you need third-party testing, we will contact with them to do it.
9: QC
Pre-sales: Material test, adopt Olympus spectrometer,material test report, third party test(necessary)
In-sales: test product material, weight, size, bulk number,pressure,Temperature resistance
After-sales:
Providing professional installation guidance and on-site guidance if necessary
If any problem, offer suitable opinion to solve.
About product
1:customized and logo?
Yes, we can do it
2:Package
Small plastic woven bag, super sack, cartons or upon your requirement
3:Certification
If necessary, we will entrust third-party to do it
4: MOQ
1 cubic meter
5:Production time
5-7 days to meet one 20 FCL container loading requirement
6:How much is the proofing fee? How long does the sample come out?
If only need 3D proofing, 5-7 days will finish after confirming drawing. If only need injected sample, 30-40 days will finish after confirming mold
7:HS code
Common customs codes is 3926909090,8419909000,6903200000,8419909000 and so on.