Ceramic Intalox Saddle Rings

Product Details
Customization: Available
CAS No.: 66402-68-4
EINECS: 266-340-9
Still deciding? Get samples of US$ 35/Bag
Request Sample
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2006

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
215
Year of Establishment
2003-01-17
  • Ceramic Intalox Saddle Rings
  • Ceramic Intalox Saddle Rings
  • Ceramic Intalox Saddle Rings
  • Ceramic Intalox Saddle Rings
  • Ceramic Intalox Saddle Rings
  • Ceramic Intalox Saddle Rings
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Packaging & Shipping
  • Installation Instructions
  • Company Profile
  • Our Advantages
  • After Sales Service
  • FAQ
Overview

Basic Info.

Model NO.
FXC-DB201216-A1
Formula
Cuznfe4o4
Structure Feature
Ring Form Filler
Acid Resistance
99%
Water Absorption
Less Than 0.3%
Porosity
Less Than 1%
Specfic Heat
850-900 J/Kg.Deg
Mohs
6.5
Max Operation Temp
920-1200 Degree
Thermal Conductivity
0.9-1.0 W/Mk
Material
Ceramic
Type
Random Packing
Usage
Chemical Engineering, Chemical Industry Product
Source
No Description
Effect
Rto Media
Transport Package
Ton Bag/Carton
Specification
16, 25, 38, 50, 76, 100mm
Trademark
FXSINO
Origin
Jiangxi, China
Production Capacity
2000cbm/Month

Product Description

Product Description

Ceramic Intalox Saddle Rings
(equivalent to Koch-Glitsch CERAMIC INTALOX SADDLES) are between the ring shape and the shape of the saddle, and therefore maintain both their advantages; this structure is conducive to the liquid gas distribution. Ceramic saddles are most frequently used high-performance packing and exhibit advantages for most applications in comparison with other shapes. Their smooth surface imparts a high chemical resistance and provides with a high level of stability.  Due to their simple form, ceramic saddles can be manufactured by continuous extrusion method and can be produced at a relatively low cost.

Applications:
Ceramic Saddles are widely used in Scrubbers, Drying Towers, Tail Gas Scrubbers, Impasse Towers, absorption tower, cooling tower, scrubber, and regeneration tower. Also widely used as heat transfer media in Regenerative Thermal oxidizers (RTO).
Chemical composition of Ceramic Saddles:

SiO2 Al2O3 Fe2O3 CaO MgO K2O+Na2O Other
>73% 17-23% <1.0% <0.5% <0.5% 2-4% <0.1%
Physical properties of Ceramic Saddles:
Nominal size 1/2" 5/8" 3/4" 1" 1.5" 2" 3"
12mm 16mm 19mm 25mm 38mm 50mm 76mm
Number per m3 740,000 282,000 230,000 84,000 25,000 9,300 2,400
Package densit(kg/m3) 780 710 700 630 590 560 540
Free volume (%) 73 70 74 74 75 76 78
Surface area (m2/m3) 620 535 390 255 166 120 90
Specific gravity(g/cm3) 2.3-2.4
Water absorption (%) <0.3
Acid resistance (%) >99.6
Max operating temp. 1100ºC
Porosity (%) <1
Moh's hardness (scale) >6.5
 
Detailed Photos

 

Ceramic Intalox Saddle Rings
many mass transfer applications including; hot potassium carbonate; chlorine cooling and drying, absorption; mercaptan removal; natural gas or LPG sweetening; and corrosive distillation.
 

Feature:
Large porosity, low pressure drop and mass transfer unit height, high flooding point, sufficient vapor-liquid contact, low specific gravity, high mass transfer efficiency, pressure drop, high flux, high efficiency, high load elasticity, good pollution resistance, etc. Features

 
Packaging & Shipping

Packaging:
1: Round type Super sack(1000*1000*1000 mm) on Fumigation Pallet
20 super sacks is equal to one 20 GP container loading quantity
2: 100L Plastic Woven bag
10 bags is equal to one cubic meter
3: Cartons on Fumigation pallet
8 cartons is equal to one cubic meter
If you have any other requirement, do it on your requirement.

Shipping:
Once achieved Purchase with us, we will let you know our production Production plan and schedule.In case of delayed shipment, We will notify customers three days in advance.


 

Ceramic Intalox Saddle Rings
Ceramic Intalox Saddle Rings
Ceramic Intalox Saddle Rings

 

Installation Instructions

Installation
1:According to the tower equipment diagram,and make sure that packing installation heights is correct.
2:When installing, it should always be poured from a certain height away from the packing layer. People should not stand directly on the packing to prevent the packing from deformation and uneven density. Wooden boards can be laid on the packing to disperse the force.
3:Other sundries, packaging bags, etc. is forbidden during the installation
4:Generally filled by random packing
5:After finished, if there is unevenness, use a wooden strip to naturally push it flat

 

Ceramic Intalox Saddle Rings
Ceramic Intalox Saddle Rings
Ceramic Intalox Saddle Rings

 


 

Company Profile

Founded in Pingxiang City of Jiangxi Province in 1998, mainly engaged in the design and manufacture of tower internals, packing, tower trays and the process of energy saving. Mainly develop the production, test and engineering service of mass transfer and separation in Chemical, Petrochemical, Refinery, Fertilizer, Oil & Gas and Environmental Protection areas.
With many years of technological development and production innovation, FXSINO has a very complete production equipment and strength. Widely cooperation with domestic famous Research institute & Multinational Group let FXSINO gain an unprecedented leap in the filed of production application recently.We provide our clients the best priced tower packing, trays and tower internals with good quality, practical utility and high - efficiency. Meanwhile, positively assist our customer resolve some questions which happened in project design, equipment commission, later maintenance& replacement etc.


 

Ceramic Intalox Saddle Rings
Ceramic Intalox Saddle Rings
Ceramic Intalox Saddle Rings


 

Our Advantages

1:Automatic Intelligent warehouse
1.1 Allows auto handing and scaning of label info via OCR technology which integrated to Fxsino's warehouse system 
1.2 Magnetic Guidance Lurking AGV Unmanned vehicle can pick,deliver,yard all cargo to warehouse
1.3: Connected with FXSINO EPR to fulfill warehouse process automation
1.4:Warehouse capacity is close to 80000 cbms

2:Intelligent management robot
2.1: 24 hours non-stop inspection against product's quality,package,worker's efficiency and so on .
2.2 Timely find equipment's failure and inform technical staff to repair
2.3.Face recognition technology will monitor workers working status and prevent irregularities by outsiders.

3:AR visual system+5G+MAS
3.1 Based on China Unicom mobile proxy server full coverage, Our customers can see the production status of orders in real time through AR glasses.
3.2 we can collect all data,include in product daily output, material consumption, warehouse real-time inventory, order progress and so on via 5G data platform.

4:Technical research and development capability

4.1 Through cooperation with co-partner named tianjin University,Zhejiang University of Technology,Nanchang University,Tsinghua University and so on,we can provide EPC to you. Meanwhile, to assist customers to resolve with facing problem.


 

After Sales Service

1:Pre-purchase service
Fully understand customer's requirement, and give our professional opinion to help them.

2:User Training
Owing to our product has many different type, so it has many different installation way. For each type product, we must let you know its basically installation way. If necessary, issue one installation manual to them.

3:Warranty services
So called"Warranty services" is repairing replacement of selected parts for a selected period of time. For the first year, the customers are provided with free replacement or repairing of the device for any problem except for Abnormal use environment. For EPC project, we will issue our warranty booklet to our customer for each components. As for unmentioned, we will negotiated with our customer about warranty range and period

4:Online support
24 hours online service. For different problems, we will find related staff to solve with your problem timely.

5:Return and Replacement
In the warranty period, we provide free replacement of the product in case of any queries. Of course, if customers does not agree, we will refund after reduce some fees related with this deal.

6:Outsourcing and guiding installation

For customer's different requirement, Under achieving related fees payed standard(such as worker daily install fees,board and lodging and so on),we can send our installation team to help customer to install product installation. Of course, if you do not need our installation, we also send our engineer to guide how to install. So you would pay for the guiding fees.

FAQ

About US
1: Are you a manufacture or trader?
We are a professional manufacturer over 20 years
2: Do you participate in Exhibition?
Yes, Such Achema, Chemical Technology Equipment Expo, ECEE and so on
3:Where is your company? And visit?
Located in Anyuan Industry Park, Pingxiang City, Jiangxi Province.Welcome you to visit
4:Payment way
For oversea market, 30% advanced payment and 70% against copy of B/L or negotiation with you
5: After sales service
Please watch our related description
6:How long does it take to receive a reply after sending an inquiry?
24 hours. For busy, 48 hours.
7:Working time
A.M 8:00-P.M.5:00. However, for any question from internet, telephone,wechat and so on, answer you immediately.
8:Third-party test?

We have our owned testing center. If you need third-party testing, we will contact with them to do it.
9: QC
Pre-sales: Material test, adopt Olympus spectrometer,material test report, third party test(necessary)
In-sales: test product material, weight, size, bulk number,pressure,Temperature resistance
After-sales:
Providing professional installation guidance and on-site guidance if necessary
If any problem, offer suitable opinion to solve.

About product
1:customized and logo?
Yes, we can do it
2:Package
Small plastic woven bag, super sack, cartons or upon your requirement
3:Certification
If necessary, we will entrust third-party to do it
4: MOQ
1 cubic meter
5:Production time
5-7 days to meet one 20 FCL container loading requirement
6:How much is the proofing fee? How long does the sample come out?
If only need 3D proofing, 5-7 days will finish after confirming drawing. If only need injected sample, 30-40 days will finish after confirming mold
7:HS code
Common customs codes is 3926909090,8419909000,6903200000,8419909000 and so on.

 







 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier
People who viewed this also viewed