Chemical Cleaning of Tower Packing Rings

Product Details
Customization: Available
CAS No.: 9003-07-0
EINECS: 200-815-3
Still deciding? Get samples of US$ 10/Bag
Request Sample
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2006

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
215
Year of Establishment
2003-01-17
  • Chemical Cleaning of Tower Packing Rings
  • Chemical Cleaning of Tower Packing Rings
  • Chemical Cleaning of Tower Packing Rings
  • Chemical Cleaning of Tower Packing Rings
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Product Parameters
  • Installation Instructions
  • Company Profile
  • Our Advantages
  • After Sales Service
  • FAQ
Overview

Basic Info.

Model NO.
FXP-DB-191217-A1
Structure Feature
Saddle Ring Filler
Material
Plastic
Type
Random Packing
Effect
Separation
Source
No Description
Transport Package
Small Bag, Super Sack, Carton and So on
Specification
25, 50, 76 mm
Trademark
FXSINO
Origin
China
HS Code
3926909090
Production Capacity
3000 Cbm/Month

Product Description

Product Description

Chemical Cleaning of Tower Packing Rings:

 Beta rings are the most famous random packing. They are mainly used in absorption systems. Anyway they suit for any mass transfer between a liquid phase and a vapour phase.

This packing is easily installed in a column.

They consist of hollow cylinders which height is equal to their diameter and which sides has got openings with some reinforcement tongues inside.

Operating mode

The liquid phase flows on the random packing, when the vapour phase is coming up counter-current. The surface of the packing makes the mass transfer possible between the two phases.

InstallationIn a column, the packing is laying on a support grid. In addition to the function of supporting the packing, the support grid distributes the vapour.

To warrant a good efficiency a liquid distributor must be installed on the top of the packing to distribute the liquid.

A liquid re-distributor may be required when the packing height exceeds about 5 meters .

A hold down grid may be installed to prevent the packing bed to lift in case of a wrong operation.

Chemical Cleaning of Tower Packing Rings
 

Detailed Photos
Chemical Cleaning of Tower Packing Rings
Chemical Cleaning of Tower Packing Rings

 

Product Parameters
Product Name Diameter Void age Fraction Bulk Weight
Beta Ring 25mm 94 53kg/m³ 3.3lb/ft³
Beta Ring 50mm 94 54kg/m³ 3.4lb/ft³
Beta Ring 76mm 96 38kg/m³ 2.4lb/ft³
Installation Instructions

Installation
1:According to the tower equipment diagram,and make sure that packing installation heights is correct.
2:When installing, it should always be poured from a certain height away from the packing layer. People should not stand directly on the packing to prevent the packing from deformation and uneven density. Wooden boards can be laid on the packing to disperse the force.
3:Other sundries, packaging bags, etc. is forbidden during the installation
4:Generally filled by random packing
5:After finished, if there is unevenness, use a wooden strip to naturally push it flat


 

Company Profile

Chemical Cleaning of Tower Packing Rings

Our Advantages

FXSINO Advantage:
1:Automatic Intelligent warehouse
1.1 Allows auto handling and scanning of label info via OCR technology which integrated to Fxsino's warehouse system.
1.2 Magnetic Guidance Lurking AGV Unmanned vehicle can pick, deliver,yard all cargo to warehouse.
1.3: Connected with FXSINO EPR to fulfill warehouse process automation
1.4:Warehouse capacity is close to 80000 cbms

2:Intelligent management robot
2.1: 24 hours non-stop inspection against product's quality,package,worker's efficiency and so on .
2.2 Timely find equipment's failure and inform technical staff to repair
2.3.Face recognition technology will monitor workers working status and prevent irregularities by outsiders.

3:AR visual system+5G+MAS
3.1 Based on China Unicom mobile proxy server full coverage, Our customers can see the production status of orders in real time through AR glasses.
3.2 we can collect all data,include in product daily output, material consumption, warehouse real-time inventory, order progress and so on via 5G data platform.

4:Technical research and development capability
4.1 Through cooperation with co-partner named tianjin University,Zhejiang University of Technology,Nanchang University,Tsinghua University and so on,we can provide EPC to you. Meanwhile, to assist customers to resolve with facing problem.

 

After Sales Service

Chemical Cleaning of Tower Packing Rings

FAQ

FAQ:
About US
1: Are you a manufacture or trader?
We are a professional manufacturer over 20 years
2: Do you participate in Exhibition?
Yes, Such Achema, Chemical Technology Equipment Expo, ECEE and so on
3:Where is your company? And visit?
Located in Anyuan Industry Park, Pingxiang City, Jiangxi Province.Welcome you to visit
4:Payment way
For oversea market, 30% advanced payment and 70% against copy of B/L or negotiation with you
5: After sales service
Please watch our related description
6:How long does it take to receive a reply after sending an inquiry?
24 hours. For busy, 48 hours.
7:Working time

A.M 8:00-P.M.5:00. However, for any question from internet, telephone,wechat and so on, answer you immediately.
8:Third-party test?
We have our owned testing center. If you need third-party testing, we will contact with them to do it.
9: QC
Pre-sales: Material test, adopt Olympus spectrometer,material test report, third party test(necessary)
In-sales: test product material, weight, size, bulk number,pressure,Temperature resistance
After-sales:
Providing professional installation guidance and on-site guidance if necessary
If any problem, offer suitable opinion to solve.

About product
1:customized and logo?
Yes, we can do it
2:Package
Small plastic woven bag, super sack, cartons or upon your requirement
3:Certification
If necessary, we will entrust third-party to do it
4: MOQ
1 cubic meter
5:Production time
5-7 days to meet one 20 FCL container loading requirement
6:How much is the proofing fee? How long does the sample come out?
If only need 3D proofing, 5-7 days will finish after confirming drawing. If only need injected sample, 30-40 days will finish after confirming mold
7:HS code
Common customs codes is 3926909090,8419909000,6903200000,8419909000 and so on.

 

 







 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier