Metallic Corrugated Plate Structured Packing:
It is a structure packing,which uniform geometry distribute in tower. This packing limits gas-liquid flow, improve channel flow and wall flow phenomenon, lower pressure drop. Meanwhile, it also provide more bigger surface area and achieve better mass transfer,heat transfer performance. The earliest Metal structured packing was invented by Swiss Sulzer in 1977. After then, Structured packing's apply, design, manufacture was widely promoted by many companies.
Type/ | Theoretical Plate Number/ NT/(1/m) |
Surface area a/(m2/m3) |
Void ratio/ % |
Liquid Loading/ U{m³/(m².h} |
F Factor/F Fmax/{m/s(Kg/m³)0.5} |
Pressure Drop/ (Mpa/m) |
125Y | 1-1.2 | 125 | 98.5 | 0.2-100 | 3 | 2.0*10 -4 |
250Y | 2-3 | 250 | 97 | 0.2-100 | 2.6 | 3.0*10 -4 |
350Y | 3.5-4 | 350 | 95 | 0.2-100 | 2.0 | 3.5*10 -4 |
500Y | 4-4.5 | 500 | 93 | 0.2-100 | 1.8 | 4.0*10 -4 |
700Y | 6-8 | 700 | 85 | 0.2-100 | 1.6 | 4.6-6.6*10 -4 |
125X | 0.8-0.9 | 125 | 98.5 | 0.2-100 | 3.5 | 1.3*10 -4 |
250X | 1.6-2 | 250 | 97 | 0.2-100 | 2.8 | 1.4*10 -4 |
350X | 2.3-2.8 | 350 | 95 | 0.2-100 | 2.2 | 1.8*10 -4 |
1.1:The packing is assembled from the top of the support and marked at a certain distance (e.g. 1 or 2 meters) in order to keep track of the height tolerance of the packing layer.As soon as damage to the tower wall is detected, stop and notify the relevant personnel to deal with it in a timely manner.
1.2:The first layer of Metal structured packing 's installation direction is refer to assemble diagram. As for the rest of Metal Structured packing, each layer is staggered at 90 degrees to the next adjacent layer. Each packing module will be lied by the drawing sequence.Perimeter Packing Modules must be tightly fitted to the tower wall without any gaps. Other Packing modules has not any gap. After installation of each layer, Using filling tool to adjust each module's the looseness and tightness ensure all modules' Loosen and tighten evenly. After then, remove the wire and packing tape and tread lightly with your feet. No clutter is allowed in the tower
1.3:Each layer of packing is assembled from the wall towards the center of the tower. If a large gap in the last piece of the installation's happened, we can use one piece or many piece to be filled in the gap. Strictly forbidden to kick or poke the packing.
1.4:The installer should hold the packing gently to minimize damage to the packing during installation
1.5:In the case of special reason for not being able to install,Emergency treatment in accordance with the advice of our on-site instructors
1.6:If the tower roundness bias is very big(indirectly influence Module installation), inform our on-site instructor and and enter withdrawal and cut corrugated monoliths with his approval.No withdrawal and cutting without prior consent.
1.7:After each layer of packing is installed, it must be approved by our on-site instructor before the next tray of packing is installed
1:Automatic Intelligent warehouse
1.1 Allows auto handling and scanning of label info via OCR technology which integrated to Fxsino's warehouse system.
1.2 Magnetic Guidance Lurking AGV Unmanned vehicle can pick, deliver,yard all cargo to warehouse.
1.3: Connected with FXSINO EPR to fulfill warehouse process automation
1.4:Warehouse capacity is close to 80000 cbms
2:Intelligent management robot
2.1: 24 hours non-stop inspection against product's quality,package,worker's efficiency and so on .
2.2 Timely find equipment's failure and inform technical staff to repair
2.3.Face recognition technology will monitor workers working status and prevent irregularities by outsiders.
3:AR visual system+5G+MAS
3.1 Based on China Unicom mobile proxy server full coverage, Our customers can see the production status of orders in real time through AR glasses.
3.2 we can collect all data,include in product daily output, material consumption, warehouse real-time inventory, order progress and so on via 5G data platform.
4:Technical research and development capability
4.1 Through cooperation with co-partner named tianjin University,Zhejiang University of Technology,Nanchang University,Tsinghua University and so on,we can provide EPC to you. Meanwhile, to assist customers to resolve with facing problem.