Customization: | Available |
---|---|
Application: | Various Separation, Absorption |
CAS No.: | 65997-19-5 |
Still deciding? Get samples of US$ 10/Bag
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Lower Aspect Ratio Metal Cascade Mini Ring:
Ideal Height-diameter ratio ensure CMR Parallel stacked(similar to structured packing stacking). In some way, it promote gas-liquid fully contacting.Metal cascade mini ring's two end's round turnup and large opening pore's area will promote liquid's continuously interflow and shunt to achieve surface's update. Therefore, it can be regarded as one high gas-liquid contacting efficiency metal random packing
Refer to HG/T21557.2-95
Size mm |
Specific area m2/m3 | Void rate % |
Bulk number Pieces/m³ |
Bulk density Kg/m³ |
Dry packing factor m-1 |
Φ25 | 220 | 96.5 | 97160 | 459 | 273.54 |
Φ38 | 154.3 | 95.9 | 31800 | 433 | 185.8 |
Φ50 | 109.2 | 96.1 | 12300 | 323.9 | 127.4 |
Φ76 | 73.5 | 97.6 | 3540 | 385 | 81 |
Size mm |
Dimension Mm (OD*ID*H*TKS) |
Bulk Density Kg/m³ |
Bulk Quantity Pcs/m³ |
Specific area m²/m |
Void % |
Factor m-1 |
0P | 17*15*6*0.3 | 472 | 530,000 | 427 | 94 | 55 |
1P | 25*22*8*0.3 | 270 | 150,000 | 230 | 96 | 40 |
1.5P | 34*29*11*0.3 | 201 | 60,910 | 198 | 97 | 29 |
2P | 43*38*14*0.4 | 230 | 33,170 | 164 | 97 | 22 |
2.5P | 51*44*17*0.4 | 186 | 17,900 | 127 | 97 | 17 |
3P | 66*57*21*0.4 | 139 | 8,800 | 105 | 98 | 14 |
4P | 86*76*29*0.4 | 143 | 5,000 | 90 | 98 | 10 |
5P | 131*118*41*0.6 | 136 | 1,480 | 65 | 98 | 7 |
1: Round type Super sack(1000*1000*1000 mm) on Fumigation Pallet
20 super sacks is equal to one 20 GP container loading quantity
2: 100L Plastic Woven bag
10 bags is equal to one cubic meter
3: Cartons on Fumigation pallet
8 cartons is equal to one cubic meter
If you have any other requirement, do it on your requirement.
Shipping:
Once achieved Purchase with us, we will let you know our production Production plan and schedule.In case of delayed shipment, We will notify customers three days in advance.
1:According to the tower equipment diagram,and make sure that packing installation heights is correct.
2:When installing, it should always be poured from a certain height away from the packing layer. People should not stand directly on the packing to prevent the packing from deformation and uneven density. Wooden boards can be laid on the packing to disperse the force.
3:Other sundries, packaging bags, etc. is forbidden during the installation
4:Generally filled by random packing
5:After finished, if there is unevenness, use a wooden strip to naturally push it flat
1:Automatic Intelligent warehouse
1.1 Allows auto handling and scanning of label info via OCR technology which integrated to Fxsino's warehouse system.
1.2 Magnetic Guidance Lurking AGV Unmanned vehicle can pick, deliver,yard all cargo to warehouse.
1.3: Connected with FXSINO EPR to fulfill warehouse process automation
1.4:Warehouse capacity is close to 80000 cbms
2:Intelligent management robot
2.1: 24 hours non-stop inspection against product's quality,package,worker's efficiency and so on .
2.2 Timely find equipment's failure and inform technical staff to repair
2.3.Face recognition technology will monitor workers working status and prevent irregularities by outsiders.
3:AR visual system+5G+MAS
3.1 Based on China Unicom mobile proxy server full coverage, Our customers can see the production status of orders in real time through AR glasses.
3.2 we can collect all data,include in product daily output, material consumption, warehouse real-time inventory, order progress and so on via 5G data platform.
4:Technical research and development capability
4.1 Through cooperation with co-partner named tianjin University,Zhejiang University of Technology,Nanchang University,Tsinghua University and so on,we can provide EPC to you. Meanwhile, to assist customers to resolve with facing problem.
About US
1: Are you a manufacture or trader?
We are a professional manufacturer over 20 years
2: Do you participate in Exhibition?
Yes, Such Achema, Chemical Technology Equipment Expo, ECEE and so on
3:Where is your company? And visit?
Located in Anyuan Industry Park, Pingxiang City, Jiangxi Province.Welcome you to visit
4:Payment way
For oversea market, 30% advanced payment and 70% against copy of B/L or negotiation with you
5: After sales service
Please watch our related description
6:How long does it take to receive a reply after sending an inquiry?
24 hours. For busy, 48 hours.
7:Working time
A.M 8:00-P.M.5:00. However, for any question from internet, telephone,wechat and so on, answer you immediately
8:Third-party test?
We have our owned testing center. If you need third-party testing, we will contact with them to do it.
9: QC
Pre-sales: Material test, adopt Olympus spectrometer,material test report, third party test(necessary)
In-sales: test product material, weight, size, bulk number,pressure,Temperature resistance
After-sales:
Providing professional installation guidance and on-site guidance if necessary
If any problem, offer suitable opinion to solve.
About product
1:customized and logo?
Yes, we can do it
2:Package
Small plastic woven bag, super sack, cartons or upon your requirement
3:Certification
If necessary, we will entrust third-party to do it
4: MOQ
1 cubic meter
5:Production time
5-7 days to meet one 20 FCL container loading requirement
6:How much is the proofing fee? How long does the sample come out?
If only need 3D proofing, 5-7 days will finish after confirming drawing. If only need injected sample, 30-40 days will finish after confirming mold
7:HS code
Common customs codes is 3926909090,8419909000,6903200000,8419909000 and so on.