• Double Layer Honeycomb Type Desulfurization Packing
  • Double Layer Honeycomb Type Desulfurization Packing
  • Double Layer Honeycomb Type Desulfurization Packing
  • Double Layer Honeycomb Type Desulfurization Packing
  • Double Layer Honeycomb Type Desulfurization Packing
  • Double Layer Honeycomb Type Desulfurization Packing

Double Layer Honeycomb Type Desulfurization Packing

Material: Plastic
Process: Injection
Pore Shape: Honeycomb
Function: Support Body
Transport Package: Wooden Crate, Carton and So on
Specification: 400-3000 mm
Samples:
US$ 80/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2006

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
  • Overview
  • Product Description
  • Detailed Photos
  • Packaging & Shipping
  • Installation Instructions
  • Company Profile
  • Our Advantages
  • After Sales Service
  • FAQ
Overview

Basic Info.

Model NO.
FXP-DB210609-A1
Trademark
FXSINO
Origin
China
HS Code
3926909090
Production Capacity
1000 Cbm/Month

Product Description

Product Description

Double layer honeycomb type desulfurization packing:
It is belongs to support components,which usually install in the bottom of packing layer. Owing to gas will pass through support components from the tower bottom, the size of the opening area will determine the flux and gas distribution. Over 75% opening area guarantees the free flow of gas and liquid and 3 mm plate thickness ensures that each product can withstand 300 kg (or more) of load.

The hexa-grid is a modern flat bar support plate recommended for use in mass transfer process  which highly prone to fouling. this applies,for instance, to substance system tending towards polymerization which coat the surface of the support plate.the hexa-grid support grid plate is designed to ensure high degrees of solidity with a minimum material input.The Vertical Support rods are shaped so as to make it impossible for the dumped packings to block the orifices.

 

Specification mm Surface area m2/m3 Void ratio % Spray density m3/m2.h Sheet Thickness Theoretical weight Kg/m3 Dry Factor 1/m
1205*450*80 90 90 20-70 2 68-83 123
1190*422*80 120 88 20-70 2 105 176
1165*420*80 150 86 20-70 2 125 235


Double Layer Honeycomb Type Desulfurization Packing
 

Detailed Photos

 

Double Layer Honeycomb Type Desulfurization Packing
Double Layer Honeycomb Type Desulfurization Packing


 

Packaging & Shipping

Double Layer Honeycomb Type Desulfurization Packing

Installation Instructions

Installation
1:According to the tower equipment diagram,and make sure that packing installation heights is correct.
2:When installing, it should always be poured from a certain height away from the packing layer. People should not stand directly on the packing to prevent the packing from deformation and uneven density. Wooden boards can be laid on the packing to disperse the force.
3:Other sundries, packaging bags, etc. is forbidden during the installation
4:Generally filled by random packing
5:After finished, if there is unevenness, use a wooden strip to naturally push it flat


 

Company Profile

Double Layer Honeycomb Type Desulfurization Packing

Our Advantages

FXSINO Advantage:
1:Automatic Intelligent warehouse
1.1 Allows auto handling and scanning of label info via OCR technology which integrated to Fxsino's warehouse system.
1.2 Magnetic Guidance Lurking AGV Unmanned vehicle can pick, deliver,yard all cargo to warehouse.
1.3: Connected with FXSINO EPR to fulfill warehouse process automation
1.4:Warehouse capacity is close to 80000 cbms

2:Intelligent management robot
2.1: 24 hours non-stop inspection against product's quality,package,worker's efficiency and so on .
2.2 Timely find equipment's failure and inform technical staff to repair
2.3.Face recognition technology will monitor workers working status and prevent irregularities by outsiders.

3:AR visual system+5G+MAS
3.1 Based on China Unicom mobile proxy server full coverage, Our customers can see the production status of orders in real time through AR glasses.
3.2 we can collect all data,include in product daily output, material consumption, warehouse real-time inventory, order progress and so on via 5G data platform.

4:Technical research and development capability
4.1 Through cooperation with co-partner named tianjin University,Zhejiang University of Technology,Nanchang University,Tsinghua University and so on,we can provide EPC to you. Meanwhile, to assist customers to resolve with facing problem.

 

After Sales Service

Double Layer Honeycomb Type Desulfurization Packing

FAQ

About US
1: Are you a manufacture or trader?
We are a professional manufacturer over 20 years
2: Do you participate in Exhibition?
Yes, Such Achema, Chemical Technology Equipment Expo, ECEE and so on
3:Where is your company? And visit?
Located in Anyuan Industry Park, Pingxiang City, Jiangxi Province.Welcome you to visit
4:Payment way
For oversea market, 30% advanced payment and 70% against copy of B/L or negotiation with you
5: After sales service
Please watch our related description
6:How long does it take to receive a reply after sending an inquiry?
24 hours. For busy, 48 hours.
7:Working time
A.M 8:00-P.M.5:00. However, for any question from internet, telephone,wechat and so on, answer you immediately.
8:Third-party test?
We have our owned testing center. If you need third-party testing, we will contact with them to do it.
9: QC
Pre-sales: Material test, adopt Olympus spectrometer,material test report, third party test(necessary)
In-sales: test product material, weight, size, bulk number,pressure,Temperature resistance
After-sales:
Providing professional installation guidance and on-site guidance if necessary
If any problem, offer suitable opinion to solve.

About product
1:customized and logo?
Yes, we can do it
2:Package
Small plastic woven bag, super sack, cartons or upon your requirement
3:Certification
If necessary, we will entrust third-party to do it
4: MOQ
1 cubic meter
5:Production time
5-7 days to meet one 20 FCL container loading requirement
6:How much is the proofing fee? How long does the sample come out?
If only need 3D proofing, 5-7 days will finish after confirming drawing. If only need injected sample, 30-40 days will finish after confirming mold
7:HS code
Common customs codes is 3926909090,8419909000,6903200000,8419909000 and so on.

 







 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2006

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
215
Year of Establishment
2003-01-17