S Wave Cooling Tower Filler

Product Details
Customization: Available
Material: Grpp
Process: Stamping, Cutting and Paste
Still deciding? Get samples of US$ 10/Piece
Request Sample
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2006

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
215
Year of Establishment
2003-01-17
  • S Wave Cooling Tower Filler
  • S Wave Cooling Tower Filler
  • S Wave Cooling Tower Filler
Find Similar Products
  • Overview
  • Product Description
  • Packaging & Shipping
  • Installation Instructions
  • Company Profile
  • Our Advantages
  • After Sales Service
  • FAQ
Overview

Basic Info.

Model NO.
FXP-DB210716-A1
Sample
Free
Function
Sedimentation
Brand
Fxsino
Certification
ISO 14001:2015, 45001:2018, 9001:2018
Package
Be Wrapped by Plastic Film on Wooden Pallet
Transport Package
Be Tied up by Plastic Rope on Wooden Pallet
Specification
30.35.50, 80 mm
Trademark
FXSINO
Origin
China
HS Code
3926909090
Production Capacity
3000 Sqm/Month

Product Description

Product Description

S Wave Cooling tower filler :
It was designed by China Institue of Water Resource and Hydropower Research.S wave cooling tower fills has trapezoidal "s" wave design, which increases the closure number of water film, and makes the water film redistribute repeatedly as well as tending to be more uniform.increase the vertical convex retention corrugations, and promote the horizontal diffusivity of water film. It extends the time for heat and mass transfer and improves the cooling effect. Several pieces of fills are connected with each other, forming honeycomb passages, which prevents contaminants from blocking. It is widely used for counter-flow cooling tower in industrial area and cement cooling tower with hyperbolic curve in power plant.The adaptive temperature is 68ºC - minus 35ºC, the flame retardation performance is good, and the oxygen index is higher than or equal to 40ºC.
 

S Wave Cooling Tower Filler
S Wave Cooling Tower Filler

 

Technical Parameter:

Technical Parameter
Material Color Temperature
ºC
Sheet size
mm
Distance of two sheets
mm
Sheet Thickness
mm
Assemble way
Pvc&PP White,blue -35-85 ºC 1000*500 mm 33 0.35-0.6   Paste


Trade Details:
Related Trade Information
HS Code 3926909090
Package Be tied by plastic rope & stacked on wooden pallet
Process Method High temperature roll forming
Material PVC,Modified PVC.
Typical Application industrial counterflow cooling tower, and power plant hyperbolic cement cooling tower.
Production time 7 days against one 20GP container loading quantity
Executive standard NDGJ88-89 or refer to your detailed requirement
Sample Free samples within 500 Grams
Other Accept EPC turnkey,OEM/OEM,Mold Customization,Installation&Guidance,Test, Entrusted design service etc.

:

Packaging & Shipping

S Wave Cooling Tower Filler

 

 

 
Installation Instructions

1.Complete the installation of the support frame---2.tube settler ironing---3.Packing pool assembly---4.--- Tube settler fixed---5.Run debugging

Tube settler Installation, transportation,storage requirement:

  1. According to customer drawing, first install tube settler support frame and check all welding points. Meanwhile,and do antiseptic treatment on the surface of the stent.
  2. In-situ ironing sheets, one module is a square, neatly stacked.
  3. All modules will be assembled from left to right under keeping tilt angle unchanged, when all modules will be finished, if there is some place to filled, please ironing some sheets to fill in this space.
  4. In order to avoid product Deformation, do not be squeezed and placed in a high temperature environment for a long time.
Company Profile

S Wave Cooling Tower Filler

 

Our Advantages

1:Automatic Intelligent warehouse
1.1 Allows auto handling and scanning of label info via OCR technology which integrated to Fxsino's warehouse system.
1.2 Magnetic Guidance Lurking AGV Unmanned vehicle can pick, deliver,yard all cargo to warehouse.
1.3: Connected with FXSINO EPR to fulfill warehouse process automation
1.4:Warehouse capacity is close to 80000 cbms

2:Intelligent management robot
2.1: 24 hours non-stop inspection against product's quality,package,worker's efficiency and so on .
2.2 Timely find equipment's failure and inform technical staff to repair
2.3.Face recognition technology will monitor workers working status and prevent irregularities by outsiders.

3:AR visual system+5G+MAS
3.1 Based on China Unicom mobile proxy server full coverage, Our customers can see the production status of orders in real time through AR glasses.
3.2 we can collect all data,include in product daily output, material consumption, warehouse real-time inventory, order progress and so on via 5G data platform.

4:Technical research and development capability
4.1 Through cooperation with co-partner named tianjin University,Zhejiang University of Technology,Nanchang University,Tsinghua University and so on,we can provide EPC to you. Meanwhile, to assist customers to resolve with facing problem.

 

After Sales Service

S Wave Cooling Tower Filler

 

FAQ

S Wave Cooling Tower Filler

 
 
 
 
 
 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier