Metal Plate-net Corrugated Packing :
It is formed from corrugated sheets of perforated embossed metal or wire gauze. The result is a very open honeycomb structure with inclined flow channels giving a relatively high surface area but with very low resistance to gas flow. The surface enhancements have been chosen to maximize liquid spreading. These characteristics tend to show significant performance benefits in low pressure and low irrigation rate applications. Metal Structured Packing is manufactured in a wide range of sizes by different crimp altitude. The Packing Surface ranges from 50 m²/m³ (lowest efficiency, highest capacity) to 750 m²/m³ ( highest efficiency, lowest capacity ).
A appropriately treated thin metal band is drawn to diamond gauze plate with appointed specification, which cuts down the complex procedures of drawing wire and knitting mesh, while the packing still has the excellent wetting ability and separation performance of wire gauze packing.
Packing Type
|
Peak heigh mm |
Pitch of waves mm |
Specific surface area m²/m³ |
Hydraulic diameter mm |
Void volume m³/m³ |
Pressure drop mmhg/m |
Theoretical plate number m-1 |
Bulk density Kg/m³ |
ACB-1
|
4.5
|
7.3
|
643
|
5.7
|
0.916
|
2-2.3
|
6-8
|
139
|
ACB-2
|
6.5
|
10.2
|
450
|
9
|
0. 955
|
1.6-1.8
|
4-5
|
120 |
Installation
1:According to the tower equipment diagram,and make sure that packing installation heights is correct.
2:When installing, it should always be poured from a certain height away from the packing layer. People should not stand directly on the packing to prevent the packing from deformation and uneven density. Wooden boards can be laid on the packing to disperse the force.
3:Other sundries, packaging bags, etc. is forbidden during the installation
4:Generally filled by random packing
5:After finished, if there is unevenness, use a wooden strip to naturally push it flat
1:Pre-purchase service
Fully understand customer's requirement, and give our professional opinion to help them.
2:User Training
Owing to our product has many different type, so it has many different installation way. For each type product, we must let you know its basically installation way. If necessary, issue one installation manual to them.
About US
1: Are you a manufacture or trader?
We are a professional manufacturer over 20 years
2: Do you participate in Exhibition?
Yes, Such Achema, Chemical Technology Equipment Expo, ECEE and so on
3:Where is your company? And visit?
Located in Anyuan Industry Park, Pingxiang City, Jiangxi Province.Welcome you to visit
4:Payment way
For oversea market, 30% advanced payment and 70% against copy of B/L or negotiation with you
5: After sales service
Please watch our related description
6:How long does it take to receive a reply after sending an inquiry?
24 hours. For busy, 48 hours.
7:Working time
A.M 8:00-P.M.5:00. However, for any question from internet, telephone,wechat and so on, answer you immediately.
8:Third-party test?
We have our owned testing center. If you need third-party testing, we will contact with them to do it.
9: QC
Pre-sales: Material test, adopt Olympus spectrometer,material test report, third party test(necessary)
In-sales: test product material, weight, size, bulk number,pressure,Temperature resistance
After-sales:
Providing professional installation guidance and on-site guidance if necessary
If any problem, offer suitable opinion to solve.
About product
1:customized and logo?
Yes, we can do it
2:Package
Small plastic woven bag, super sack, cartons or upon your requirement
3:Certification
If necessary, we will entrust third-party to do it
4: MOQ
1 cubic meter
5:Production time
5-7 days to meet one 20 FCL container loading requirement
6:How much is the proofing fee? How long does the sample come out?
If only need 3D proofing, 5-7 days will finish after confirming drawing. If only need injected sample, 30-40 days will finish after confirming mold
7:HS code
Common customs codes is 3926909090,8419909000,6903200000,8419909000 and so on.