• Plastic Super Torus Saddle
  • Plastic Super Torus Saddle
  • Plastic Super Torus Saddle
  • Plastic Super Torus Saddle

Plastic Super Torus Saddle

CAS No.: 9003-07-0
Formula: Polypropylene
EINECS: 200=815-3
Material: Plastic
Structure Feature: Arcuate Concave and Convex Petals
Type: Random Packing
Samples:
US$ 10/Bag 1 Bag(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2006

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
  • Overview
  • Product Description
  • Detailed Photos
  • Packaging & Shipping
  • Installation Instructions
  • Company Profile
  • Our Advantages
  • After Sales Service
  • FAQ
Overview

Basic Info.

Model NO.
FXP-DB210310-A1
Usage
Chemical Engineering, Chemical Industry Product, Sewage Treatment, Speed up Gas& Liquid Contacting and Particle Fall
Effect
Speed up Gas& Liquid Contacting and Particle Fall
Source
No Descriptioin
Transport Package
Small Bag, Super Sack, Carton and So on
Specification
25, 50, 76 mm
Trademark
FXSINO
Origin
China
HS Code
3926909090
Production Capacity
3000 Cbm/Month

Product Description

Product Description

Plastic Super Torus Saddle :
Plastic Super Torus Saddle's shape is similar like plastic intalox saddles, it change two ends into wave type contact surface. when gas flows upward, liquid will flow downward along with wave channel. This movement way will not only promote liquid and gas contacting effienciency, but also speed up two phase update frequency.

By omitting the surface structure as much as possible, the gas flow becomes smooth and the pressure loss is reduced.
The liquid distribution is uniform and the number of redispersers can be reduced.

Owing its high HETP, low pressure loss, high strength and so on,
it was recognized  high performance packing by FRI (Fractionation Research, Inc.), a global research institute for distillation

 

Size inch Weight Kg/m³ Number/m³ Surface area m²/m³ Void ratio %
1 70 36,600 240 90
2 62 5,600 110 94
3 41 1,245 90 96
Detailed Photos
Plastic Super Torus Saddle
used for the exhaust gas treatment equipment, absorption tower, distillation column, and emission tower that we handle.

 

Packaging & Shipping


Plastic Super Torus Saddle

 

Installation Instructions

Installation
1:According to the tower equipment diagram,and make sure that packing installation heights is correct.
2:When installing, it should always be poured from a certain height away from the packing layer. People should not stand directly on the packing to prevent the packing from deformation and uneven density. Wooden boards can be laid on the packing to disperse the force.
3:Other sundries, packaging bags, etc. is forbidden during the installation
4:Generally filled by random packing
5:After finished, if there is unevenness, use a wooden strip to naturally push it flat


 

Plastic Super Torus Saddle
Plastic Super Torus Saddle
Plastic Super Torus Saddle


 

Company Profile


Plastic Super Torus Saddle

 


 

Our Advantages

Plastic Super Torus Saddle

 

 

After Sales Service

After sales service
1:Pre-purchase service
Fully understand customer's requirement, and give our professional opinion to help them.

2:User Training
Owing to our product has many different type, so it has many different installation way. For each type product, we must let you know its basically installation way. If necessary, issue one installation manual to them.

3:Warranty services
So called"Warranty services" is repairing replacement of selected parts for a selected period of time. For the first year, the customers are provided with free replacement or repairing of the device for any problem except for Abnormal use environment. For EPC project, we will issue our warranty booklet to our customer for each components. As for unmentioned, we will negotiated with our customer about warranty range and period

4:Online support
24 hours online service. For different problems, we will find related staff to solve with your problem timely.

5:Return and Replacement
In the warranty period, we provide free replacement of the product in case of any queries. Of course, if customers does not agree, we will refund after reduce some fees related with this deal.

6:Outsourcing and guiding installation
For customer's different requirement, Under achieving related fees payed standard(such as worker daily install fees,board and lodging and so on),we can send our installation team to help customer to install product installation. Of course, if you do not need our installation, we also send our engineer to guide how to install. So you would pay for the guiding fees. 

FAQ

About US
1: Are you a manufacture or trader?
We are a professional manufacturer over 20 years
2: Do you participate in Exhibition?
Yes, Such Achema, Chemical Technology Equipment Expo, ECEE and so on
3:Where is your company? And visit?
Located in Anyuan Industry Park, Pingxiang City, Jiangxi Province.Welcome you to visit
4:Payment way
For oversea market, 30% advanced payment and 70% against copy of B/L or negotiation with you
5: After sales service
Please watch our related description
6:How long does it take to receive a reply after sending an inquiry?
24 hours. For busy, 48 hours.
7:Working time
A.M 8:00-P.M.5:00. However, for any question from internet, telephone,wechat and so on, answer you immediately.
8:Third-party test?
We have our owned testing center. If you need third-party testing, we will contact with them to do it.
9: QC
Pre-sales: Material test, adopt Olympus spectrometer,material test report, third party test(necessary)
In-sales: test product material, weight, size, bulk number,pressure,Temperature resistance
After-sales:
Providing professional installation guidance and on-site guidance if necessary
If any problem, offer suitable opinion to solve.

About product
1:customized and logo?
Yes, we can do it
2:Package
Small plastic woven bag, super sack, cartons or upon your requirement
3:Certification
If necessary, we will entrust third-party to do it
4: MOQ
1 cubic meter
5:Production time
5-7 days to meet one 20 FCL container loading requirement
6:How much is the proofing fee? How long does the sample come out?
If only need 3D proofing, 5-7 days will finish after confirming drawing. If only need injected sample, 30-40 days will finish after confirming mold
7:HS code
Common customs codes is 3926909090,8419909000,6903200000,8419909000 and so on.

 






 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2006

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
215
Year of Establishment
2003-01-17