Customization: | Available |
---|---|
CAS No.: | 9003-07-0 |
EINECS: | 200-815-3 |
Still deciding? Get samples of US$ 10/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
PP plastic corrugated plate packing :
Mass transfer plastic structured packings are manufactured by welding profile-shaped plastic foils onto each other. Two aspects are important:
Even liquid distribution from the structure of the whole packingThe profile-shaped foils as well as the structure reached by the inclination of the foils towards each other (channel inclination) achieve an even liquid distribution throughout the packing for low up to very high liquid loads.
High rate of mass transfer by profile-shaped foilsThe wave-like profiles (inner structure) of the single foils assure a continuous thorough mixing of gas and liquid. This constant renewal of the gas/liquid boundary results in high mass transfer rates.
This design proves to be more efficient than for example random packings. Tests have shown that MASSdek structured packings reach a significantly higher throughput and a lower pressure drop at the same level of mass transfer performance.
Product Name | HCL absorbers plastic corrugated plate packing | ||||||
Material | PP/PVC | ||||||
Type | Theo Plate | Surface Area (m2/m3) |
Void (%) |
Pressure Drop (Mpa/m) |
Packing Density (kg/m3) |
Max F Factor m/s(kg/m3)0.5 |
Liquid Loading (m3/m2.hr) |
SB-125Y | 1-2 | 125 | 0.98 | 200 | 45 | 3 | 0.20-100 |
SB-250Y | 2-2.5 | 250 | 0.97 | 300 | 60 | 2.6 | 0.20-100 |
SB-350Y | 3.5-4 | 350 | 0.94 | 200 | 80 | 2 | 0.20-100 |
SB-500Y | 4-4.5 | 500 | 0.92 | 300 | 130 | 1.8 | 0.20-100 |
SB-125X | 0.8-1.9 | 125 | 0.98 | 140 | 40 | 3.5 | 0.20-100 |
SB-250X | 1.5-2 | 250 | 0.97 | 130 | 75 | 2.2 | 0.20-100 |
SB-350X | 2.3-2.8 | 350 | 0.94 | 130 | 75 | 2.2 | 0.20-100 |
SB-500X | 2.8-3.2 | 500 | 0.92 | 180 | 120 | 2 | 0.20-100 |
Advantage | There are small holes in the filler sheet, with large energy, low pressure drop and high spevific surface area, in impvoving production, reducing energy consumption and improving efficiency has a greater advantage | ||||||
Application | Absorption, scrubbing, separation tower | ||||||
Package | Wooden case/pallet | ||||||
MOQ | 1CBM |
Packaging:
1: Round type Super sack(1000*1000*1000 mm) on Fumigation Pallet
20 super sacks is equal to one 20 GP container loading quantity
2: 100L Plastic Woven bag
10 bags is equal to one cubic meter
3: Cartons on Fumigation pallet
8 cartons is equal to one cubic meter
If you have any other requirement, do it on your requirement.
Shipping:
Once achieved Purchase with us, we will let you know our production Production plan and schedule.In case of delayed shipment, We will notify customers three days in advance.
1:According to the tower equipment diagram,and make sure that packing installation heights is correct.
2:When installing, it should always be poured from a certain height away from the packing layer. People should not stand directly on the packing to prevent the packing from deformation and uneven density. Wooden boards can be laid on the packing to disperse the force.
3:Other sundries, packaging bags, etc. is forbidden during the installation
4:Generally filled by random packing
5:After finished, if there is unevenness, use a wooden strip to naturally push it flat
Founded in Pingxiang City of Jiangxi Province in 1998, mainly engaged in the design and manufacture of tower internals, packing, tower trays and the process of energy saving. Mainly develop the production, test and engineering service of mass transfer and separation in Chemical, Petrochemical, Refinery, Fertilizer, Oil & Gas and Environmental Protection areas.
With many years of technological development and production innovation, FXSINO has a very complete production equipment and strength. Widely cooperation with domestic famous Research institute & Multinational Group let FXSINO gain an unprecedented leap in the filed of production application recently.We provide our clients the best priced tower packing, trays and tower internals with good quality, practical utility and high - efficiency. Meanwhile, positively assist our customer resolve some questions which happened in project design, equipment commission, later maintenance& replacement etc.
After sales service
1:Pre-purchase service
Fully understand customer's requirement, and give our professional opinion to help them.
2:User Training
Owing to our product has many different type, so it has many different installation way. For each type product, we must let you know its basically installation way. If necessary, issue one installation manual to them.
4:Online support
24 hours online service. For different problems, we will find related staff to solve with your problem timely.
5:Return and Replacement
In the warranty period, we provide free replacement of the product in case of any queries. Of course, if customers does not agree, we will refund after reduce some fees related with this deal.
6:Outsourcing and guiding installation
For customer's different requirement, Under achieving related fees payed standard(such as worker daily install fees,board and lodging and so on),we can send our installation team to help customer to install product installation. Of course, if you do not need our installation, we also send our engineer to guide how to install. So you would pay for the guiding fees.
About US
1: Are you a manufacture or trader?
We are a professional manufacturer over 20 years
2: Do you participate in Exhibition?
Yes, Such Achema, Chemical Technology Equipment Expo, ECEE and so on
3:Where is your company? And visit?
Located in Anyuan Industry Park, Pingxiang City, Jiangxi Province.Welcome you to visit
4:Payment way
For oversea market, 30% advanced payment and 70% against copy of B/L or negotiation with you
5: After sales service
Please watch our related description
6:How long does it take to receive a reply after sending an inquiry?
24 hours. For busy, 48 hours.
7:Working time
A.M 8:00-P.M.5:00. However, for any question from internet, telephone,wechat and so on, answer you immediately.
8:Third-party test?
We have our owned testing center. If you need third-party testing, we will contact with them to do it.
9: QC
Pre-sales: Material test, adopt Olympus spectrometer,material test report, third party test(necessary)
In-sales: test product material, weight, size, bulk number,pressure,Temperature resistance
After-sales:
Providing professional installation guidance and on-site guidance if necessary
If any problem, offer suitable opinion to solve.
About product
1:customized and logo?
Yes, we can do it
2:Package
Small plastic woven bag, super sack, cartons or upon your requirement
3:Certification
If necessary, we will entrust third-party to do it
4: MOQ
1 cubic meter
5:Production time
5-7 days to meet one 20 FCL container loading requirement
6:How much is the proofing fee? How long does the sample come out?
If only need 3D proofing, 5-7 days will finish after confirming drawing. If only need injected sample, 30-40 days will finish after confirming mold
7:HS code
Common customs codes is 3926909090,8419909000,6903200000,8419909000 and so on.